Axel REE (ASX: AXL) has hit 18m at 5,451ppm TREO from surface in auger drilling outside its Area A resource at the Caladão project in Minas Gerais, Brazil. Hole CLD-AUG-601 ended in mineralisation, with the last metre of the hole running 5,628ppm TREO.
The grade is well above what Caladão already holds. Area A carries an Inferred resource of 233Mt at 2,133ppm TREO, so the best intercept runs about 2.6 times that grade.
Against the global Caladão resource grade of 1,443ppm TREO, it runs about 3.8 times. Almost a third of the intercept is magnet rare earth oxides, at 1,710ppm MREO, or 31% of the TREO grade.
The other headline holes back it up. CLD-AUG-617 returned 10m at 3,348ppm TREO from surface, with 32% magnet oxides.
CLD-AUG-569 returned 4m at 2,961ppm TREO, and CLD-AUG-599 returned 21m at 1,638ppm TREO. In all, the program returned 41 rare earth intercepts across 35 holes, using a 500ppm TREO reporting cut-off.
The program was 52 auger holes for 567.5m across three exploration licences adjoining the Paraíso deposit in Area A. Axel secured the licences in October 2025 to test the north-eastern continuation of the deposit.
Auger drilling is shallow and depth-limited, and several holes ended in mineralisation, so the base of the mineralisation has not been tested.
Managing Director Dr Patience Mpofu said: “We secured the adjoining exploration licences at Area A to test the north-eastern continuation of the deposit. Drilling has intersected thick rare earth mineralisation from surface, including 18m at 5,451 ppm TREO, and gallium mineralisation on the elevated lateritic plateau. This work is separate from our Woolrich ISR programme at Area B, and we will assess how the results could inform a future Area A Mineral Resource update.”
Axel REE is advancing Caladão as an ionic-clay rare earth project, built around in situ recovery (ISR) using magnesium sulphate leaching rather than open-pit mining.
The company says the approach aims to minimise surface disturbance and capital intensity through modular plants set within wellfields.
Axel REE (ASX: AXL)
Caladão hosts a global rare earth resource of 708.6Mt at 1,443ppm TREO, including a maiden Indicated resource of 110.1Mt at 1,073ppm TREO at Woolrich, announced on 24 September 2026.
The global gallium resource stands at 575.68Mt at 37.05ppm Ga. At Area A itself, the gallium resource is 100Mt at 42.23ppm Ga.
Axel says the new results do not change its previously announced resource estimates. The adjoining licences were not included in the original Area A estimate, and the drilling will inform further work to assess whether the Area A estimate can grow.
What does the gallium add?
Gallium is concentrated on the higher-elevation lateritic plateau, the same setting that hosts the Area A gallium resource. The program returned 18 gallium intercepts across 16 holes, using a 50 g/t gallium cut-off.
The best was CLD-AUG-613, with 9m at 78.3 g/t Ga2O3 from surface. CLD-AUG-579 returned 13m at 76.5 g/t Ga2O3.
The grades are reported as gallium oxide, and the announcement converts them to the element: 78.3 g/t Ga2O3 is 58.2 g/t gallium.
On that element basis, the best intercept runs about 1.4 times the Area A gallium resource grade of 42.23ppm gallium.
In addition, the company is running metallurgical programs to unlock value from gallium and scandium in the near-surface oxidised profile, in parallel with the rare earth work.
What happens next?
Axel will assess the new results alongside the existing Area A geological and resource models. That assessment will set the requirements for further drilling, soluble rare earth testwork and any future update to the Area A resource estimate.
The Area A extension work is separate from the Woolrich ISR field programme in Area B, which remains Axel’s highest priority. Infill drilling continues at Woolrich in preparation for the field trial.
Sources
- Axel REE Limited, ASX announcement, “Drilling Extends High Grade REE And Gallium Mineralisation Outside the 709Mt REE and 576Mt Ga Global Resource at Caladão”, 26 November 2026: https://announcements.asx.com.au/asxpdf/20261126/pdf/0772t4g8y8rcs3.pdf
- Axel REE Limited, “100Mt Maiden Gallium Inferred Mineral Resource Estimate at Caladão Project – Area A”, 22 August 2025 (cited in the 26 November 2026 announcement)
- Axel REE Limited, “233Mt Inferred REE Resource Enhances Caladão Project – Area A”, 1 October 2025 (cited in the 26 November 2026 announcement)
- Axel REE Limited, “Caladão Project’s Global REE Resource Grows to 0.71 Billion Tonnes Following Woolrich Resource Upgrade Drilling”, 24 September 2026 (cited in the 26 November 2026 announcement)
- Axel REE Limited: https://axelreelimited.com.au