Far East Gold Ltd (ASX: FEG) has reported a maiden JORC (2012) Mineral Resource Estimate for its Woyla gold-silver project in Aceh Province, Sumatra, Indonesia: 19.4 million tonnes at 0.71 grams per tonne gold and 11.6 grams per tonne silver, for 441,000 ounces of gold and 7.2 million ounces of silver, or 549,000 ounces of gold equivalent.
The estimate, announced on 17 November 2026 and effective 9 November 2026, covers four low-sulphidation epithermal vein deposits, Rek Rinti-Agam, Aloe Rek, Aloe Eumpeuk and Anak Perak, inside a 24,260-hectare sixth-generation Contract of Work originally established by Barrick. Far East Gold holds an indirect 51 per cent interest in the project holder, PT Woyla Aceh Minerals. It is a Mineral Resource, not an Ore Reserve, and the company states it does not have demonstrated economic viability.
The resource is reported in situ within optimised open-pit shells above a 0.15 grams per tonne gold-equivalent cut-off, on a 100 per cent project basis.
Most of the metal is Inferred, and one deposit dominates
Indicated Resources total 5.1 million tonnes at 0.76 grams per tonne gold and 10.5 grams per tonne silver for 151,000 ounces of gold equivalent, or 27 per cent of the contained metal. The remaining 398,000 ounces, about 73 per cent, are Inferred. No Measured Resource has been estimated.
Rek Rinti-Agam is the cornerstone. It holds 16.6 million tonnes at 0.64 grams per tonne gold and 11.1 grams per tonne silver for 343,000 ounces of gold and 5.9 million ounces of silver, or 432,000 ounces of gold equivalent, about 79 per cent of the project total.
The three smaller deposits are higher grade but much smaller: Aloe Rek totals 71,000 ounces of gold equivalent, Aloe Eumpeuk is silver-rich at 53.9 grams per tonne silver, and Anak Perak holds 11,000 ounces of gold equivalent.
| Deposit | Category | Tonnes (Mt) | Au (g/t) | Ag (g/t) | AuEq (g/t) | Au (koz) | Ag (Moz) | AuEq (koz) |
|---|---|---|---|---|---|---|---|---|
| Rek Rinti-Agam | Indicated | 4.4 | 0.64 | 9.4 | 0.78 | 90 | 1.33 | 110 |
| Rek Rinti-Agam | Inferred | 12.2 | 0.64 | 11.7 | 0.82 | 253 | 4.60 | 322 |
| Aloe Rek | Indicated | 0.3 | 2.02 | 7.0 | 2.12 | 19 | 0.07 | 20 |
| Aloe Rek | Inferred | 1.6 | 0.89 | 4.9 | 0.97 | 47 | 0.26 | 51 |
| Aloe Eumpeuk | Indicated | 0.2 | 1.05 | 37.6 | 1.62 | 8 | 0.29 | 12 |
| Aloe Eumpeuk | Inferred | 0.3 | 1.59 | 68.4 | 2.62 | 14 | 0.59 | 22 |
| Anak Perak | Indicated | 0.2 | 1.25 | 6.9 | 1.36 | 8 | 0.04 | 8 |
| Anak Perak | Inferred | 0.1 | 0.83 | 7.1 | 0.94 | 3 | 0.03 | 3 |
| Total | Indicated | 5.1 | 0.76 | 10.5 | 0.92 | 125 | 1.73 | 151 |
| Total | Inferred | 14.3 | 0.69 | 11.9 | 0.87 | 316 | 5.47 | 398 |
| Total | Total | 19.4 | 0.71 | 11.6 | 0.88 | 441 | 7.20 | 549 |
Source: Far East Gold, “Woyla Maiden JORC Mineral Resource Estimate”, ASX announcement, 17 November 2026, Table 1. Reported in situ within optimised open-pit shells above a 0.15 g/t AuEq cut-off, on a 100 per cent project basis.
There is a higher-grade core inside the low-grade total. Above a 1.0 grams per tonne gold-equivalent cut-off, the estimate contains about 5.2 million tonnes at 1.75 grams per tonne gold equivalent for about 293,000 ounces, or 53 per cent of the contained metal within 27 per cent of the tonnage. The company stresses this is a grade-tonnage presentation, not a separate Mineral Resource.
Built on 133 holes, on ground Barrick never drilled
The estimate is based on 133 diamond holes for 20,585 metres drilled by Far East Gold between September 2022 and July 2024. Of those, 111 intersected gold-bearing veins and were used to define the mineralised domains. Only four of the nine known prospects inside the Contract of Work have been drilled; the other five, including the Kareung Reuboh discovery, are undrilled exploration targets.
Barrick explored the area between 1995 and 1997 and identified the four vein systems, but did not drill. Newcrest held an earn-in between 1999 and 2002 but completed no additional fieldwork. The Contract of Work was suspended during the Aceh conflict before being reactivated on 14 October 2022.
Geological modelling and resource estimation were undertaken by Pratama Abimanyu, Senior Resource Geologist and an independent consultant to Far East Gold. Michael C Corey, a Member of Professional Geoscientists Ontario, reviewed the supporting data and takes responsibility for the estimate as Competent Person under the 2012 JORC Code.
What the gold-equivalent number assumes
Gold-equivalent grades are calculated as gold plus 0.015 times silver, reflecting a recovery-adjusted silver-to-gold value ratio of about 67 to 1, based on assumed prices of US$3,500 an ounce for gold and US$59.06 an ounce for silver, and recoveries of 90 per cent for gold and 80 per cent for silver.
Two hurdles stand between the resource and a mine
The first is tenure. The Contract of Work is in the exploration stage. Its exploration term ran from 14 October 2022 to 14 October 2024, and the extension application is being processed by Indonesia’s Directorate General of Minerals and Coal.
The second is land status. All four deposits lie within Protected Forest. Open-pit mining will require the relevant areas to be reclassified to Production Forest. A desktop study, confirmed by the Ministry of Forestry, identified 15,425.09 hectares, or 63.75 per cent, of the Contract of Work area as potentially eligible.
Chief executive Shane Menere said the company would now evaluate a potential sale or joint venture. “Delivering a maiden JORC Resource of 549,000 ounces of gold equivalent, including 441,000 ounces of gold and 7.2 million ounces of silver, is an outstanding result, particularly when you consider that we have only drilled four of the nine known prospects across this extensive project,” he said.
Far East Gold said its combined JORC gold resources across its Indonesian portfolio now exceed 2.2 million ounces. Far East Gold shares closed at $0.098 on 17 November 2026, down 2.0 per cent on the day, according to LiveASX. On 23 November 2026 the company had a market capitalisation of about A$41.7 million at $0.10 a share, according to stockanalysis.com.
What happens next, according to the announcement, is infill and extension drilling, first-pass drilling of the untested prospects, and metallurgical and geotechnical studies. Whether the resource grows depends on the five undrilled prospects.
Sources
- Far East Gold Ltd, “Woyla Maiden JORC Mineral Resource Estimate”, ASX announcement, 17 November 2026. https://asx.api.cmfyapp.com/asx-research/1.0/file/2924-03162316-2A1710866&v=undefined (mirror of the ASX announcement PDF; also available via marketindex.com.au at https://www.marketindex.com.au/data-api/api/v1/announcements/XASX:FEG:2A1710866/pdf/inline/woyla-maiden-jorc-mineral-resource)
- Far East Gold Ltd, “Woyla Project, JORC Mineral Resource Report”, November 2026 (accompanies the announcement; 101 pages including JORC Table 1 and drill hole collar details).
- LiveASX, Far East Gold Ltd announcements (share price $0.098 on 17 November 2026). https://liveasx.com.au/companies/feg
- stockanalysis.com, Far East Gold Limited (ASX: FEG) market capitalisation, A$41.70 million at $0.10, 23 November 2026. https://stockanalysis.com/quote/asx/FEG/market-cap/